WBS 1: Building the WBS and assigning quantities
The WBS is the list of work activities on a job, grouped into phases. Each activity becomes a row in the Estimate, and its quantity stays linked to the takeoff, so a change on the plans flows straight through.
How to
- 1
Build the activity tree
Add activities and group them into phases. Indent rows to set the hierarchy.
- 2
Assign quantities
Click the hand icon in the Quantity column, tick the quantities that belong to the activity and choose Save assignment. One quantity can feed several activities.
- 3
Choose net or gross
Switch the quantity basis between net and gross (net plus waste) for each activity.
- 4
Check units
An amber flag means the activity's unit doesn't match its linked quantity. Change the unit or link a different quantity.
- 5
Check against the plans
Open the WBS beside Plans and Takeoffs to confirm each assignment on the drawing.
- 6
Link build rates
Pull a build rate from your RateBuild library onto an activity, ready for the Estimate.