BOQ 1: From takeoff to Bill of Quantities
The BOQ is the measured list of what will be built. It stays linked to the takeoffs it came from, so a change on the plan updates the quantity.
How to
- 1
Measure on the plans
Every takeoff you measure is added to the BOQ automatically, with its category, page and description.
- 2
Review the grouped items
Check quantities grouped by category or page, and tidy descriptions and units before pricing.
- 3
Add dimensions and wastage
Enter Width, Height, Depth or Thickness for a calculated quantity, and a Wastage % for the net quantity to order.
- 4
Keep it linked
Adjust a measurement on the plan and its BOQ quantity updates; nothing is copied by hand.